The Hokuriku Shinkansen (Japanese: 北陸新幹線 ) is a high-speed Shinkansen railway line connecting Tokyo with Tsuruga in the Hokuriku region of Japan. It is jointly operated by East Japan Railway Company (JR East) and West Japan Railway Company (JR West).

Hokuriku Shinkansen
JR East E7 series train on the Hokuriku Shinkansen
Overview
Native name 北陸新幹線
Status Operational
Owner JRTT
Locale Tokyo, Saitama, Gunma, Nagano, Niigata, Toyama, Ishikawa, and Fukui prefectures
Termini
Stations 24
Service
Type High-speed rail (Shinkansen)
System Shinkansen
Services
Operator(s) JR East (Tokyo – Jōetsumyōkō)
JR West (Jōetsumyōkō – Tsuruga)
Depot(s) Nagano, Hakusan
Rolling stock
History
Opened 1 October 1997; 29 years ago (1997-10-01)
Last extension 16 March 2024 (2024-03-16) (Kanazawa to Tsuruga)
Technical
Line length 470.6 km (292.4 mi)
Num of tracks 2
Track gauge 1,435 mm ( 4 ft 8+1⁄2 in) standard gauge
Minimum radius 4,000 m (2.5 mi; 13,000 ft)
Electrification
Operating speed
260 km/h (160 mph)
Signalling Cab signalling
Train protection system DS-ATC
3.0%
Route map

The first 117.4-kilometre (72.9 mi) section, between Takasaki and Nagano, opened on 1 October 1997, ahead of the 1998 Nagano Winter Olympics, and was originally known as the Nagano Shinkansen (長野新幹線 ). At Takasaki, the line connects with the Jōetsu Shinkansen, allowing services to continue to Tokyo. The line was extended 228.1 kilometres (141.7 mi) from Nagano to Kanazawa on 14 March 2015.[1] A further 125-kilometre (78 mi) extension from Kanazawa to Tsuruga opened on 16 March 2024.[2]

An extension from Tsuruga to Ōsaka is planned. The route was initially selected in December 2016 as an Obama–Kyoto route, with construction expected to begin in the late 2020s following environmental impact assessments.[3][4] On 15 July 2026, the proposed alignment was revised to bypass Kyoto Station, and instead stop at a new deep underground station in Kyoto near Katsuragawa Station.[5]

Train names and service patterns

edit

Since March 2015, services on the line are split into four types, with train names as listed below.[6] Trains operate over the Joetsu and Tohoku Shinkansen tracks between Tokyo and Takasaki.

  •   Kagayaki: Tokyo–Tsuruga, limited-stop service, since 14 March 2015
  •   Hakutaka: Tokyo–Tsuruga, mostly all-stations service, since 14 March 2015
  •   Tsurugi: Toyama–Tsuruga, mostly all-stations shuttle service, since 14 March 2015
  •   Asama: Tokyo–Nagano, mostly all-stations service, corresponding to existing Nagano Shinkansen service introduced in 1997

The original Nagano Shinkansen Asama services, introduced in 1997, replaced the conventional Shin'etsu Main Line limited express services, also named Asama, which previously took 2 hours 50 minutes from Tokyo (Ueno Station) to Nagano. Following the opening of the Shinkansen, part of the conventional line was abandoned between Yokokawa and Karuizawa. This section included the steeply-graded Usui Pass which required the use of bank engines on all trains. Travel time between Tokyo and Tsuruga is 3 hours 8 minutes, 50 minutes shorter than using a conventional train between Kanazawa and Tsuruga.[7]

Stations

edit

Service column legend:

● All trains stop
▲ Some trains stop
| All trains pass
Station Distance in km (mi) from Service Transfers Location
Takasaki Tokyo
Kagayaki
Tokyo
東京
108.60 (67.48) 0 (0) ● ● ● Chiyoda Tokyo
Ueno
上野
105.0 (65.2) 3.6 (2.2) ▲ ● ● Taitō
Ōmiya
大宮
77.3 (48.0) 31.3 (19.4) ● ● ● Ōmiya-ku Saitama
Kumagaya
熊谷
40.7 (25.3) 67.9 (42.2) | | ● Kumagaya
Honjō-Waseda
本庄早稲田
19.6 (12.2) 89.0 (55.3) | | ● Honjō
Takasaki
高崎
0 (0) 108.6 (67.5) | ● ● Takasaki Gunma
Annaka-Haruna
安中榛名
18.5 (11.5) 127.1 (79.0) | | ▲ Annaka
Karuizawa
軽井沢
41.8 (26.0) 150.4 (93.5) | ▲ ● Karuizawa Nagano
Sakudaira
佐久平
59.4 (36.9) 168.0 (104.4) | ▲ ● Saku
Ueda
上田
84.2 (52.3) 192.8 (119.8) | ▲ ● Ueda
Nagano
長野
117.4 (72.9) 226.0 (140.4) ● ● ● Nagano
Iiyama
飯山
147.3 (91.5) 255.9 (159.0) | ▲ Iiyama
Jōetsumyōkō
上越妙高
176.9 (109.9) 285.5 (177.4) | ● Jōetsu Niigata
Itoigawa
糸魚川
213.9 (132.9) 322.5 (200.4) | ● Itoigawa
Kurobe-Unazukionsen
黒部宇奈月温泉
253.1 (157.3) 361.7 (224.7) | ● Kurobe Toyama
Toyama
富山
286.9 (178.3) 395.5 (245.8) ● ● ● Toyama
Shin-Takaoka
新高岡
305.8 (190.0) 414.4 (257.5) | ● ● Takaoka
Kanazawa
金沢
345.5 (214.7) 454.1 (282.2) ● ● ● Kanazawa Ishikawa
Komatsu
小松
372.6 (231.5) 481.2 (299.0) ▲ ● ▲ Komatsu
Kagaonsen
加賀温泉
387.1 (240.5) 495.7 (308.0) ▲ ● ▲ Kaga
Awaraonsen
芦原温泉
403.5 (250.7) 512.0 (318.1) ▲ ● ▲ Awara Fukui
Fukui
福井
421.5 (261.9) 530.0 (329.3) ● ● ● Fukui
Echizen-Takefu[8]
越前たけふ
440.5 (273.7) 549.0 (341.1) ▲ ● ▲ Echizen
Tsuruga
敦賀
470.6 (292.4) 579.2 (359.9) ● ● ● Tsuruga
Environmental impact assessment is underway.[9]
Higashi-Obama
東小浜
[c]
Obama Fukui
Katsuragawa
桂川
[c]
 A  JR Kyoto Line Minami Kyoto
Matsuiyamate
松井山手
[c]
Kyōtanabe
Shin-Ōsaka
新大阪
Yodogawa-ku Osaka

Notes

edit
  1. 1 2 Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.
  2. ↑ Although the official terminus of the Iiyama Line is at Toyono, trains on the line run through to Nagano.
  3. 1 2 3 This is a tentative name

Rolling stock

edit
E7 series set F19 on an Asama service in February 2021

With the start of Nagano Shinkansen services, trains were operated by a new fleet of JR East E2 series 8-car sets. A fleet of 17 new E7 series 12-car trainsets were phased in from March 2014, and these were augmented by a fleet of 10 JR West W7 series 12-car sets introduced from March 2015. The fleet of W7 series was purchased at a cost of ¥32.8 billion.[11] The remaining E2 series trainsets were withdrawn from Hokuriku Shinkansen services on 31 March 2017.[12]

In 2019, ten trains, eight from JR East with a book value of ¥11.8 billion and two from JR West, were damaged when a train yard in Nagano was flooded as the Chikuma River overflowed during typhoon Hagibis.[11][13] As a result, JR West suffered a loss of ¥3 billion (2019) (equivalent to ¥3.25 billion or US$21.49 million in 2024)[14].[13]

Non-revenue-earning types

edit

Former rolling stock

edit
  • E2 series 8-car "N" sets on Tokyo - Nagano Asama services only
  • E2 series 8-car "J" sets
  • E4 series 8-car "P50/P80" sets as Max Asama
  • 200 series 12-car set F80 during February 1998 only

The original E2 series 8-car "J" sets, primarily used on Tohoku Shinkansen services were also used on some Asama services until they were subsequently lengthened to 10 cars. One specially-modified 200 series set, numbered F80, was used on additional Asama services in February 1998 during the 1998 Winter Olympics held in Nagano. The train was modified to operate on both 25 kV AC 50 Hz and 60 Hz overhead power supplies, incorporated weight-saving measures to comply with the 16 tonne axle load restriction, and included additional control equipment to cope with the 30‰ gradient of the Nagano Shinkansen.[15] Its maximum speed was limited to 210 km/h (130 mph).[15] The last services operated using eight-car E2 series trainsets ran on 31 March 2017, from which date all Asama services were formed of E7 and W7 series trainsets.[16]

Speeds

edit

The maximum speed on the Hokuriku Shinkansen line is 260 km/h (160 mph) between Tsuruga and Takasaki.[17] Services continue beyond Takasaki on the Jōetsu Shinkansen line to Ōmiya, where the maximum speed is 275 km/h (171 mph).[18] Between Ōmiya and Tokyo, Hokuriku Shinkansen services operate over the Tōhoku Shinkansen line, with a maximum speed of 130 km/h (81 mph) between Ōmiya and Ueno and 110 km/h (68 mph) between Ueno and Tokyo.[19]

Electrification

edit

The Hokuriku Shinkansen is electrified at 25 kV AC, but uniquely amongst Shinkansen routes, it crosses Japan’s 50 Hz/60 Hz frequency boundary three times, requiring dual-frequency rolling stock. The section between Tokyo and Karuizawa operates at 50 Hz, while the section between Karuizawa and Itoigawa operates at 60 Hz. The frequency then changes back to 50 Hz between Itoigawa and Kurobe-Unazukionsen, before returning to 60 Hz for the remainder of the line to Tsuruga. The E7 series and W7 series trainsets are equipped with onboard converters and automatic frequency-switching equipment to operate across the different power systems.[20]

History

edit

Nagano Shinkansen

edit

The initial section between Takasaki and Nagano opened on 1 October 1997, in time for the 1998 Winter Olympics in Nagano.

Between May 2012 and March 2014, station platforms on the Nagano Shinkansen had their platform roofs extended to handle the E7 series 12-car trains which entered service in March 2014 ahead of the March 2015 opening of the extension beyond Nagano.[21] The Hokuriku Shinkansen extension from Nagano to Kanazawa opened in March 2015.[21] The 113 km (70 mi) extension from Kanazawa to Tsuruga was approved for construction in June 2012.[22]

From the start of the revised timetable on 15 March 2014, E7 series trainsets were introduced on Asama services.[10] Initially used on seven return services daily, this number was increased to eleven return services daily from 19 April 2014.[10]

Naming

edit

The line's legal name has always been Hokuriku Shinkansen. However, just before the opening of the Nagano section, JR East decided that using this name in passenger service was to be avoided. From 22 March 1997 until the extension of the Hokuriku Shinkansen to Kanazawa, the primary route for Hokuriku customers (from the Tokyo area) was to use the Joetsu Shinkansen to Echigo-Yuzawa Station, then transfer to a Hakutaka service via the Hokuetsu Express, rendering using the Takasaki–Nagano section of the Hokuriku Shinkansen meaningless for them. Therefore, JR East sought other names.[23]

Alternatively, local governments in Hokuriku, fearing construction west of Nagano may be halted, petitioned that the name "Hokuriku" should remain in use for operational purposes. [24]

JR East announced the following solution on 25 July 1997:[25]

  • Voice announcements using "Nagano Shinkansen"
  • Tokyo area stations using depictions with "Nagano-bound Shinkansen".
  • Stations between Annaka-Haruna Station and Nagano Station depicting "Shinkansen" only.

Soon, "Nagano-bound Shinkansen" fell out of use, and timetables by various publishers use "Nagano Shinkansen" only.[26] Construction to Kanazawa was officially decided, thereby reducing the opposition to the name.

Extension beyond Nagano

edit
Construction of the Hokuriku Shinkansen extension near Kanazawa Station in March 2008

Construction of the extension from Nagano to Kanazawa was completed on 24 May 2014.[27] When services commenced in March 2015, the travel time from Tokyo to Toyama was reduced to about two hours, with Kanazawa an additional 30 minutes away.[27] Final permission to start construction to Fukui was granted in December 2011, with modification works to Fukui Station already in progress for several years in anticipation of the extension.[28] The extension to Tsuruga was approved for construction on 30 June 2012,[29] and opened on 16 March 2024.[30] Beyond Jōetsumyōkō Station, the line is operated by West Japan Railway Company (JR West) instead of East Japan Railway Company (JR East).[31]

Naming issue rises again

edit

Many people speculated about and discussed what the line's operational name should be after Nagano–Kanazawa section is completed.

Nagano economic associations argued a sudden change in name will confuse customers, propose "Nagano–Hokuriku Shinkansen" to be used.[32] In contrast government officials and economic associations in Hokuriku region defended the legal name, including statements such as "a just result should come after 3 prefectures striving for 40 years".[33][34][35]

The section west of Jōetsumyōkō belongs to JR West, which did not state an opinion and used "Hokuriku Shinkansen" only.[36]

On 2 October 2013, JR East announced formal line name will be Hokuriku Shinkansen (consistent with National Shinkansen Railway Development Act) and depicted as Hokuriku Shinkansen (via Nagano) to reflect its expansion into the region, resolving the naming issue.[37]

Test-running

edit
Construction of the Hokuriku Shinkansen near Fukui Station in August 2007

Test-running on the JR East section of the line between Nagano and Kurobe-Unazukionsen commenced on 1 December 2013, initially at low speeds using the "East i" test train.[38] From 6 December of that year, test-running commenced using 10-car E2 series trainsets, with running speeds gradually increased to the full line speed of 260 km/h (160 mph).[38] Test-running continued until the end of March 2014.[38] Test-running on the entire line between Nagano and Kanazawa (Hakusan Depot) started on 1 August 2014, using the "East i" test train.[39] Test-running using W7 series trains commenced on 5 August 2014, initially at low speed, on the JR West section between Kanazawa and Jōetsumyōkō.[40]

Tsuruga extension

edit

In the months preceding the opening, JR West conducted various low speed runs on the new Kanazawa-Tsuruga section using "East i" test trains on 23 September 2023.[41] Runs using regular W7 series trainsets started on 26 September.[41] Regular passenger service began on 16 March 2024, with ceremonies at both Tsuruga and Tōkyō from the respective presidents of JR West and JR East.[42] The extension cost ¥1.67 trillion (US$10.55 billion) to build.[43]

In accordance with the opening of the extension, the limited express service Thunderbird ended its service between Tsuruga and Kanazawa on 15 March 2024.[44]

Future plans

edit
Routes considerered

The route of the final section from Tsuruga to Shin-Ōsaka was selected by the Liberal Democratic Party (LDP) and Japan Innovation Party (JIP), the parties forming Japan's ruling coalition, on 15 July 2026. The route will run from Tsuruga through Obama and eastern Kyoto Prefecture, bypassing Kyoto Station in favor of a new station near Katsuragawa Station, approximately 5 kilometres (3.1 mi) west of Kyoto Station. The underground station will be approximately 50 metres (160 ft) below ground and connected to central Kyoto by conventional railway services. From Katsuragawa, the line will continue to the Matsuiyamate area before reaching Shin-Ōsaka, where passengers will be able to transfer to the Tōkaidō Shinkansen, San'yō Shinkansen, and other services. The planned extension will be approximately 139 kilometres (86 mi) long and is expected to take about 26 years to complete. The route was originally selected as the Obama–Kyoto route in 2016, but its alignment within Kyoto was subsequently reconsidered. The project was estimated to cost ¥3.4 trillion (equivalent to ¥3.49 trillion or US$23.07 billion in 2024)[14] in April 2023, although the estimate was expected to increase because of rising construction costs.[5]

Before the current route was selected, several alternatives were considered. The Maibara Route would have connected Tsuruga directly to Maibara Station and used the Tōkaidō Shinkansen for through services to Kyoto and Osaka, but would have bypassed Obama and required trains to use the already congested Tōkaidō Shinkansen. The Obama Route would have followed a direct route from Tsuruga through Obama and Kameoka to Osaka, bypassing Kyoto, but serving the city was considered important for tourism and use of the line. A longer Maizuru Route was also proposed, adding a stop in Maizuru. The Kosei Route proposed upgrading the existing Kosei Line for Mini-Shinkansen operation through regauging or dual-gauging, or using Gauge Change Train (GCT) technology.[45] GCT technology was also proposed as an interim means of providing through service west of Tsuruga before completion of the Shinkansen extension, but the GCT project was abandoned in 2018.[46][47]

Conventional lines running parallel to the Hokuriku Shinkansen

edit

With the opening of the initial Nagano Shinkansen section in October 1997, the section of the conventional (narrow gauge) Shinetsu Main Line running along approximately the same route between Karuizawa and Shinonoi was transferred from the control of JR East to a newly established third-sector railway operating company, Shinano Railway, becoming the Shinano Railway Line.

With the opening of the Hokuriku Shinkansen extension north of Nagano on 14 March 2015, the conventional lines running along approximately the same route were transferred from the control of their respective JR owning companies to newly established third-sector railway operating companies funded primarily by the prefectural and municipal governments through which the lines pass. A total of 252.2 km (156.7 mi) of route between Nagano and Kanazawa was transferred to four separate operating companies, including 75.0 km (46.6 mi) of the Shinetsu Main Line between Nagano and Naoetsu, and 177.2 km (110.1 mi) of the Hokuriku Main Line between Naoetsu and Kanazawa.[48] Details of the five third-sector operating companies and their respective lines are as shown below.[48]

In 2019, it was decided that the section of the Hokuriku Main Line between Tsuruga and Fukui would be transferred to third-sector railway operating companies.[49] Three years later in 2022, it was determined that the section would be split among two operators. The IR Ishikawa Railway would extend their operations from Kanazawa to Daishoji,[50] while a new company, Hapi-Line Fukui,[51] established during the preparation phase, would take over the section between Daishoji and Tsuruga. Hapi-Line Fukui took over the 84.3 km (52.4 mi) section of the Hokuriku Main Line on 16 March 2024.[52]

Former line name Former operator Transferred Section Length (km) New line name New operator Prefecture
Shinetsu Main Line JR East 1 October 1997 Karuizawa–Shinonoi 65.1 Shinano Railway Line Shinano Railway Nagano
14 March 2015 Nagano–Myōkō-Kōgen 37.3 Shinano Railway Kita-Shinano Line
Myōkō-Kōgen–Naoetsu 37.7 Myōkō Haneuma Line Echigo Tokimeki Railway Niigata
Hokuriku Main Line JR West Naoetsu–Ichiburi 59.3 Nihonkai Hisui Line
Ichiburi–Kurikara 100.1 Ainokaze Toyama Railway Line Ainokaze Toyama Railway Toyama
Kurikara–Kanazawa 17.8 IR Ishikawa Railway Line IR Ishikawa Railway Ishikawa
16 March 2024[2] Kanazawa–Daishōji 46.4
Daishōji–Tsuruga 84.3 Hapi-Line Fukui Line Hapi-Line Fukui Fukui

References

edit
  1. ↑ "Kanazawa to Tsuruga extension of the Hokuriku Shinkansen opens". Railway Gazette International. 18 March 2024. Retrieved 11 August 2024.
  2. 1 2 "北陸新幹線 金沢—敦賀間の開業日が2024年3月16日に決定 〜運行計画の概要を発表〜" [Hokuriku Shinkansen Extension to Tsuruga to Open on 16 March 2024]. Japan Railfan Magazine Online (in Japanese). 30 August 2023. Archived from the original on 30 August 2023. Retrieved 30 August 2023.
  3. ↑ "Hokuriku extension route agreed". Railway Gazette. London. 23 December 2016. Archived from the original on 24 November 2020. Retrieved 23 March 2018.
  4. ↑ Railway Bureau, MLIT; JRTT (August 2024). 北陸新幹線(敦賀・新大阪間)詳細駅位置・ルート図(案)ご説明資料 [Hokuriku Shinkansen (Tsuruga/Shin-Osaka) Detailed Station Locations and Route Map (Draft) Explanatory Material] (PDF). 北陸新幹線事業推進調査に関する連絡会議 [Liaison Conference on Hokuriku Shinkansen Project Promotion Survey] (in Japanese). pp. 5–6. Retrieved 11 August 2024.
  5. 1 2 Johnston, Eric (15 July 2026). "LDP and JIP decide on Kyoto route for Hokuriku Shinkansen line extension". The Japan Times.
  6. ↑ 北陸新幹線 長野~金沢間開業に伴う運行計画の概要について [Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa] (PDF) (Press release) (in Japanese). Japan: JR East & JR West. 27 August 2014. Retrieved 27 August 2014.
  7. ↑ 北陸新幹線「金沢―敦賀」延伸、地元が期待「100年に一度」のチャンス [Extension of Hokuriku Shinkansen "Kanazawa - Tsuruga", the opportunity of "once every 100 years" expected by locals] (in Japanese). Japan: Newswitch. 16 March 2024. Retrieved 16 March 2024.
  8. ↑ "北陸新幹線、新駅「越前たけふ」 福井、24年春に延伸開業 | 全国のニュース | 福井新聞ONLINE". Archived from the original on 15 May 2021.
  9. ↑ "Document on Primary Environment Impact Consideration (May 2019)" (PDF) (in Japanese). Japan Railway Construction, Transport and Technology Agency.
  10. 1 2 3 3月15日ダイヤ改正と各地の話題 [15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 43, no. 361. Japan: Kōtsū Shimbun. May 2014. p. 12.
  11. 1 2 "Ten Hokuriku Shinkansen Line trains worth ¥32.8 billion sustain damage after yard is flooded in Typhoon Hagibis". The Japan Times Online. 13 October 2019. Archived from the original on 22 October 2019. Retrieved 7 November 2019.
  12. ↑ 北陸新幹線「E2系」今月引退…五輪輸送で活躍 [Hokuriku Shinkansen E2 series to be withdrawn this month - Played an active role in transportation during the Olympics]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbun. 21 March 2017. Retrieved 22 March 2017.{{cite web}}: CS1 maint: deprecated archival service (link)
  13. 1 2 "All 10 typhoon-flooded shinkansen bullet trains to be scrapped". Kyodo News+. Retrieved 7 November 2019.
  14. 1 2 1868 to 1938: Williamson J., Nominal Wage, Cost of Living, Real Wage and Land Rent Data for Japan 1831–1938, 1939 to 1945: Bank of Japan Historical Statistics Afterwards, Japanese Historical Consumer Price Index numbers based on data available from the Japanese Statistics Bureau. Japan Historical Consumer Price Index (CPI) – 1970 to 2014 Retrieved 30 July 2014. For between 1946 and 1970, from "昭和戦後史". Retrieved 24 January 2015.
  15. 1 2 200系F80編成 [200 series set F80]. Japan Railfan Magazine. Vol. 38, no. 444. Japan: Koyusha Co., Ltd. April 1998. p. 64.
  16. ↑ E2系N編成“あさま”の営業運転終了 [E2 series N set Asama services end]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 1 April 2017. Archived from the original on 1 April 2017. Retrieved 3 April 2017.
  17. ↑ "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine. Vol. 52, no. 612. Japan: Kōyūsha Co., Ltd. April 2012. p. 14.
  18. ↑ "JR東日本、上越新幹線が最高275km/hに - 北陸新幹線も所要時間短縮". マイナビニュース (in Japanese). 25 December 2022. Retrieved 25 March 2024.
  19. ↑ "The Tohoku Shinkansen: Full Speed Ahead". NHK WORLD. Retrieved 25 March 2024.
  20. ↑ Sato, Yoshihiko (11 February 2014). "Japan: first Hokuriku trains take to the tracks". International Railway Journal. Retrieved 5 January 2026.
  21. 1 2 Ito, Tadayuki (3 May 2012). 新幹線ホーム屋根延長へ 長野県内各駅、金沢延伸に備え [Nagano Prefecture shinkansen station platforms to have roofs extended in preparation for extension to Kanazawa]. The Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. Archived from the original on 12 May 2012. Retrieved 3 May 2012.
  22. ↑ Kyodo News, "Bullet-train extensions approved", The Japan Times, 30 June 2012, p. 2
  23. ↑ 「北陸新幹線・東京-長野 10月開業を発表 列車愛称『あさま』」『信濃毎日新聞』 [Hokuriku Shinkansen Tokyo-Nagano will open October]. Shinano Daily News, Apr 16 1997 (in Japanese).
  24. ↑ 「呼称は長野か北陸か新幹線揺れる―JR東日本『まだ長野まで』北陸自治体『名前は残して』」『日本経済新聞』1997年5月5日
  25. ↑ 「北陸新幹線ダイヤを発表 長野まで最速79分 しなの鉄道2割増」『信濃毎日新聞』1997年7月26日
  26. ↑ JTB時刻表 時刻表80年のあゆみ-第3回- - JTB Publishing るるぶ.com
  27. 1 2 Igata, Katsuhiro (25 May 2014). "Hokuriku Shinkansen line between Nagano, Kanazawa completed". ajw.asahi.com. Asahi Shimbun. Archived from the original on 28 May 2014. Retrieved 27 May 2014.
  28. ↑ "「まちづくり前進」 新幹線着工方針に沸く政財界 福井". Archived from the original on 5 January 2012.
  29. ↑ "Shinkansen to get 3 new sections : National : DAILY YOMIURI ONLINE (The Daily Yomiuri)". www.yomiuri.co.jp. Retrieved 2 February 2022.{{cite web}}: CS1 maint: deprecated archival service (link)
  30. ↑ "The Shinkansen: Japan's Bullet Train". 16 September 2022.
  31. ↑ Kyodo News, "DPJ may OK three new bullet-train sections", The Japan Times, 17 December 2011, p. 1.
  32. ↑ "北陸新幹線:名称は「長野北陸新幹線」に 県商工会議所連合会らJRに要望/長野". 毎日新聞. 毎日新聞社. 17 March 2009. Retrieved 17 March 2009. [permanent dead link]
  33. ↑ "新幹線あくまで「北陸」 知事 「3県で40年努力した」". Chunichi Shimbun Tomaya ver. Chunichi Shimbun Company. 20 February 2013. Archived from the original on 22 February 2013. Retrieved 20 February 2013.
  34. ↑ "新幹線 堂々と「北陸に」 谷本知事「乗客が誤解する」". Hokuriku Chunichi Shimbun. Chunichi Shimbun Hokuriku branch. 21 February 2013. Retrieved 21 February 2013. [permanent dead link]
  35. ↑ "問答無用「北陸」で当然". 北陸中日新聞. 中日新聞北陸本社. 2 March 2013. Archived from the original on 5 March 2013. Retrieved 2 March 2013.
  36. ↑ "北陸新幹線用の新型車両について" (Press release). JR West. 4 September 2012. Retrieved 12 November 2014.
  37. ↑ Wong, Maggie Hiufu (22 December 2023). "New bullet train route makes it easier than ever to visit Japan's stunning Hokuriku region". CNN. Retrieved 14 June 2024. In 2015, the line was extended and renamed Hokuriku Shinkansen to reflect its expansion into the region, with the tracks making their way through Niigata and Toyama prefectures – the later famed f
  38. 1 2 3 北陸新幹線、12月1日から走行試験 [Hokuriku Shinkansen test running to start from 1 December]. Webun (in Japanese). Japan: The Kitanippon Shimbun. 5 October 2013. Archived from the original on 8 October 2013. Retrieved 9 October 2013.
  39. ↑ E926形"East-i"が金沢(白山総合車両所)まで走行試験 [Class E926 "East i" test run to Kanazawa (Hakusan Depot)]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 August 2014. Archived from the original on 15 July 2018. Retrieved 5 August 2014.
  40. ↑ 北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる [Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Archived from the original on 7 August 2017. Retrieved 5 August 2014.
  41. 1 2 "Test run starts on extended line of Hokuriku Shinkansen". Yoshito Asakura. 26 September 2023. Retrieved 15 March 2024.
  42. ↑ "New bullet train extension comes into service". NHK. 16 March 2024. Archived from the original on 16 March 2024. Retrieved 16 March 2024.
  43. ↑ "New bullet train extension comes into service". NHK WORLD. 15 March 2024. Archived from the original on 16 March 2024. Retrieved 20 March 2024.
  44. ↑ “さよなら北陸本線” サンダーバードも金沢-敦賀間の運行終了 ["Goodbye Hokuriku Main Line" Thunderbird also ends operation between Kanazawa and Tsuruga] (in Japanese). Japan: NHK. 15 March 2024. Archived from the original on 15 March 2024. Retrieved 15 March 2024.
  45. ↑ 北陸新幹線延伸「小浜・京都ルート」も検討 JR西日本 [JR West also considering Obama-Kyoto route for Hokuriku Shinkansen extension]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 29 August 2015. Archived from the original on 29 August 2015. Retrieved 29 August 2015.
  46. ↑ "Talks begin on Hokuriku Shinkansen extension". 7 August 2015.
  47. ↑ "北陸新幹線にフリーゲージ断念へ政府、与党とJR西日本" [Abandon free gauge on the Hokuriku Shinkansen Government, ruling party and JR West]. Fukui Shimbun (in Japanese). 25 August 2018. Archived from the original on 4 September 2019. Retrieved 17 February 2021.
  48. 1 2 Osano, Kagetoshi (March 2015). 北陸新幹線並行在来線各社の姿 [Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44, no. 371. Japan: Kōtsū Shimbun. pp. 28–33.
  49. ↑ "新幹線並行在来線の準備会社発足" [Establishment of a New Third Sector Company created to take over conventional line running parallel to the Shinkansen]. Fukui Shimbun ONLINE (in Japanese). 14 August 2019. Archived from the original on 1 September 2019. Retrieved 3 February 2024.
  50. ↑ "福井県並行在来線準備株式会社鉄道線の鉄道事業再構築実施計画の認定について". Ministry of Land, Infrastructure, Transport and Tourism (in Japanese). 19 January 2022. Archived from the original on 11 September 2023. Retrieved 3 February 2024.
  51. ↑ "新社名「株式会社ハピラインふくい」に変更しました" [The new company name has been changed to "Hapi Line Fukui Co., Ltd."]. hapi-line.co.jp (in Japanese). 4 July 2022. Archived from the original on 16 December 2023. Retrieved 3 February 2024.
  52. ↑ "並行在来線「ハピラインふくい」も3月16日開業" [Parallel conventional line “Happi Line Fukui” will also open on March 16th]. Chunichi Shimbun Web (in Japanese). 31 August 2023. Archived from the original on 4 February 2024. Retrieved 4 February 2024.
edit